Challenges
The project presented several logistical and operational challenges. The scale of the expansion, combined with the regional location of the site, required detailed planning and coordination to maintain progress alongside other construction trades.
Strict hygiene standards, temperature-controlled environments, and evolving site conditions meant the flooring system had to be delivered with precision. In addition, the project scope expanded during construction, introducing multiple variations and additional work areas that required fast, adaptable solutions without impacting the overall program.